Mila Resources PLC

Mila Resources PLC (MILA) · 2026-10-12

Further High-Grade Gold Intercepts at Yarrol

Mila Resources’ first assays from its Q3 drilling extend the Yarrol North mineralised envelope to about 170m vertical depth, materially below the historic drilling extent. The result is encouraging, but only four of nine holes have been reported and true widths have not been estimated.

Mila Resources Plc (MILA) · 2026-08-26

Upgraded JORC Resource at Kathleen Valley

Mila Resources Plc upgraded Coffey's JORC Code Mineral Resource to 41,300oz of inferred gold, 599,000 tonnes at 2.1g/t Au, effective 31 July 2026.

Mila Resources Plc (MILA) · 2026-08-20

Highly Positive Geophysics Results from Monal

Mila Resources reported geophysics identifying a 200 m to 300 m potential sulphide-bearing target at Basilica and a buried intrusive source at Childs Prospect.

Mila Resources Plc (MILA) · 2026-08-12

Mila moves to 100% Ownership in Queensland

Mila Resources completed its EMX Option Agreement, taking 100% ownership of three Queensland project areas, and will issue 7,096,774 shares valued at £110,000.

Mila Resources Plc (MILA) · 2026-08-03

Target Generation & Next Phase of Drilling

Mila Resources Plc has begun machine-learning target generation for Yarrol and is preparing a funded 1,400 m drill programme. It follows about 5,000 metres of drilling, while further targets beyond the established mineral resource area still require testing.

Mila Resources Plc (MILA) · 2026-06-22

Commencement of IP Survey at Monal Au-Cu Project

Mila has started its first IP survey at Monal in Queensland. The programme is meant to sharpen target definition and move large-scale gold-copper prospects towards drill-ready status.

Mila Resources Plc (MILA) · 2026-06-08

High-Grade Gold Intercepts Reported from Yarrol

Mila Resources reported high-grade gold intercepts at the Yarrol project, including 3m at 2.5g/t and 29m at 0.74g/t Au. Results confirm continuity beyond the historic footprint. The company is transitioning to resource evaluation with the next drilling stage planned for August 2026.